You are using an outdated browser version not supported by this website.
Click here to upgrade your browser

InteriorInterior
Leak Control Flange
Description

PVC leak control flange suitable for a variety of applications, including domestic and commercial. Compatible surface area for application of waterproofing membrane.

Key Features
  • PVC leak control flange to suit 50mm, 65mm, 80mm and 100mm pipe sizes
  • Construction cap available
  • Features locating lugs for floor waste grates
  • Flange area provides bonding surface for waterproofing membrane
  • Installable in concrete and timber settings
NZ Made
NZ Made
NZ-Owned Business
NZ-Owned Business
Scope of Use
  • Installable in concrete and timber settings
  • PVC leak control flange to suit 50mm, 65mm, 80mm and 100mm pipe sizes
Limitations on Use

Allproof floor waste products have been designed for compliance with the scope outlined in building codes listed above for internal floor drainage and to be installed as per published installation guides. For commercial and/or residential applications. Compatible with other AS/NZS and NZBC compliant DWV systems, waterproofing membrane systems and flooring systems.

Statement of Building Code Compliance

G1/AS1 Personal hygiene 1.1, 1.3.2 and clause 2.5: Allproof floor wastes are designed to provide an appropriate drainage solution for showers and various other sanitary fixtures required for personal hygiene. Floor wastes are designed to safely remove wastewater removing risk of contamination, when cleaned and correctly maintained floor wastes shall not harbour dirt and germs and prevent unpleasant odours from being emitted from the DWV system. Floor wastes for showers with a tray or a level threshold satisfy provisions of E3/AS1 internal moisture. Refer to install guides and specifications for further information.

NZBC G13/AS1 Foul water clause 1(b), 3.1(c) & (d) and clause 3.4 Floor Outlets: Allproof floor waste systems (water traps and grates) have been designed and manufactured to be compliant to all requirements set out in G13/AS1. 

> The water seal in the gully prevents foul air and gases entering buildings,

> Grates are removable to access the system for maintenance and cleaning,

> Grates finish flush with the floor,

> Outlets exceed the minimum diameter.

Refer to install guides and specifications for further information.

NZBC G13/AS3 Foul water and AS/NZS 3500.2 clauses 4.6: Allproof floor waste systems have been designed to comply with all criteria outlined in AS/NZS 3500.2 and modifications covered in NZBC G13/AS3. Outlet connections designed to specifications in Appendix A of 3500.2. Gullies designed in 

accordance with requirements in clause 4.6.

AAS 3740 clause 3.14: Allproof floor waste systems have been designed to specifications and requirements set out in AS 3740 clause 3.14 for the membrane to drainage connection following figures 3.8 and 3.9.

B2/AS1 Durability: B2.3.1 - Allproof floor waste systems meet the requirements of B2.3.1 (a) not less than 50 years, (b) not less than 15 years and (c) not less than 5 years.

WaterMark Certificate of Conformity has been obtained on all relevant floor wate components for-

> AS1260 (WMKA 21800),

> WMTS-040 (WMKT 21223),

> and AS2887 (WM 74706).

Documents
CAD/PDF Link
Installation Details Link
Specification Clause (Masterspec)
Product Maintenance
Product Warranty

0820

Brochure

A New Zealand owned company specialising in the manufacture of plumbing and drainage products and systems.

Product Enquiries

News from Allproof Industries

Drainage in Outdoor Living Spaces
Reducing Carbon in Drainage Systems
The Foundation Parnell: Accessible Solutions for a Luxury Retirement Village

Posts by Andrew Smith

See All


Posts by Justin Barber

See All


Get a free weekly digest of essential news

New and updated architectural products, design solutions, inspiration, technical advice and more when you sign up for EBOSS.