You are using an outdated browser version not supported by this website.
Click here to upgrade your browser
5,288 products with technical literature, drawings and more from leading suppliers of NZ architectural materials.
Case studies, new products and product news from leading suppliers of NZ architectural materials.
Blogs for architectural specifiers, offering product, design and business advice.
Designed to drain hot water cylinder valves through the safe tray.
This high temp rated plastic tundish is an easy-to-install solution for draining hot water cylinders through one outlet in the safe tray reducing the number of plastic fittings and time required to create a traditional install.
Applicable for use in accordance with G12 AS1 5.2.3 requiring a safe tray below hot water cylinders.
Allproof DWV products have been designed for compliance with the scope outlined in building codes listed above for the removal and drainage of foul/wastewater. Products need to be installed as per published installation guides. For commercial and/or residential applications. Compatible with other AS/NZS and NZBC compliant DWV systems
NZBC G13/AS1 Foul water: When selected and installed correctly Allproof DWV products provide the ability to create drainage systems that comply to all requirements in G13/AS1. In their correct application
Allproof DWV systems will contribute towards safeguarding people by providing an adequate plumbing and drainage system to carry waste / foul water to appropriate outfalls. Specific clauses include-
> 2.0 Materials,
> 3.2 Water trap dimensions,
> 3.4 Floor outlets,
> Figure 3. Floor waste stacks and pipes,
> 6.1 Jointing methods and all relevant AS/NZS standards.
NZBC G13/AS3 Foul water and AS/NZS 3500.2: When selected and installed correctly Allproof DWV products provide the ability to create drainage systems that comply to all requirements in G13/AS3. In their correct application Allproof DWV systems will contribute towards safeguarding people by providing an adequate plumbing and drainage system to carry waste / foul water to appropriate outfalls.
B2/AS1 Durability: B2.3.1 - Allproof floor waste systems meet the requirements of B2.3.1 (a) not less than 50 years, (b) not less than 15 years and (c) not less than 5 years.
WaterMark Certificate of Conformity has been obtained on all relevant floor wate components for-
> AS1260 (WMKA 21800),
> WMTS-040 (WMKT 21223),
> WMTS-522 (WMKT 74920),
> and AS2887 (WM 74706).
NZS5807-1980: Pipe ID Labels provide service identification information in line with specifications from Table 3, Table 5, Fig.6.
Sold New Zealand and Australia-wide, used in projects such as 30 Madden — Wynyard Central.
A New Zealand owned company specialising in the manufacture of plumbing and drainage products and systems.
Product EnquiriesNew and updated architectural products, design solutions, inspiration, technical advice and more when you sign up for EBOSS.