You are using an outdated browser version not supported by this website.
Click here to upgrade your browser

InteriorInterior
Dulux DURATION X21
Description

DURATION X21 is a premium, low odour and low VOC general purpose epoxy coating suitable for use over a wide range of primed substrates. DURATION X21 is also suitable for use on prepared concrete surfaces.

DURATION X21 can be used directly over DURATION P23 water borne anti-corrosive primer, and can also be used directly over Dulux solvent borne epoxy primers, universal primers and to aged, tightly adhering coatings subject to appropriate surface preparation.

Key Features
  • Versatile general purpose epoxy
  • Suitable for use over a wide range of primed substrates
  • Ease of application — spray, brush, roller
  • Low VOC and low odour compared to solvent borne systems
  • Fast re-coat time – 4 hours at 25°C
Scope of Use

DURATION X21 is designed to be used as part of complete DURATION water borne protective coatings system for steel that is subject to sheltered or mild (C1-C3) corrosive environments.

  • DURATION X21 can also be used on concrete floors as a trafficable floor coating
  • Fast re-coat time — 4 hours at 25°C
Limitations on Use

This is an industrial product designed for use by experienced Coating applicators. Where conditions may require variation from the recommendations on this Product Data Sheet contact your nearest Dulux Consultant for advice prior to painting. Do not apply in conditions outside the parameters stated in this document without the written consent of Dulux Australia. Do not use any product past its pot life. Product past its pot life may still appear fit for use but will develop substantially reduced gloss and may develop brittleness. Freshly mixed material must not be added to material that has been mixed for some time. The rate of cure is dependent upon temperature. Do not apply at temperatures below 10°C, or where the surface temperature is below 10°C. Do not apply at relative humidity above 85% or when the surface is less than 3°C above the dewpoint. Product should be protected against ponding water for 24 hours after application. After this period ponding water may cause temporary lightening of the colour, which will recover after the surface is dried. When applying this product to broad surfaces, use only one application method to avoid colour variation or streaking.

In-Service History

DURATION X21 has been used on projects all throughout Australia including the redevelopment of the Royal Hobart Hospital and Bright Footbridge, Victoria.

Other Performance Attributes
  • Low VOC and low odour compared to solvent borne systems
Documents
Data Sheet

August 2018

Dulux is a paint manufacturer and marketer of products that protect, maintain and enhance the spaces and places in which we live and work.

Product Enquiries

News from Dulux

Entries Now Open for the Dulux Colour Awards 2025
New and Improved Dulux Wash&Wear with Anti-Scuff Technology NEW
Dulux Colour Forecast 2025: Muted Palettes Designed to Embrace and Comfort

Posts by Dulux NZ Technical

See All


Get a free weekly digest of essential news

New and updated architectural products, design solutions, inspiration, technical advice and more when you sign up for EBOSS.