1
Along with hydraulic demands there are other risk factors that should be considered when selecting a channel system and deciding on placement.
You are using an outdated browser version not supported by this website.
Click here to upgrade your browser
5,293 products with technical literature, drawings and more from leading suppliers of NZ architectural materials.
Case studies, new products and product news from leading suppliers of NZ architectural materials.
Blogs for architectural specifiers, offering product, design and business advice.
We pipe water inside buildings, so what happens when we turn it into steam?
There are lots of configuration options when adding this form of an operable wall, and there are a few things to consider.
We often come across situations where compliance with NZBC requirements for fire protection is in conflict with other requirements.
A look at how a peel and stick weathertightness membrane performs in a fire when used as a temporary cladding.
Why strapping and lining masonry walls on the inside is not a good idea, not for renovation, not for new builds.
There is no aspect of bentonite waterproofing that is as misunderstood as how it responds to wet/dry cycling.
The more the industry talks about passive fire and engages with other construction industry professionals, the more likely we are to get it right the first time.
Below-grade shoring wall construction often proves to be difficult to obtain and maintain along the project site perimeter.
How can we safely add insulation to existing walls without risking trapped moisture and compromising durability?
While fire engineering reports are designed in line with the NZBC with a view to saving lives, we often overlook the lives of the first responders who need to go into these buildings.
New and updated architectural products, design solutions, inspiration, technical advice and more when you sign up for EBOSS.