With the building code calling for higher R-values, one of the issues faced by designers is the space required for insulation, particularly in skillion roof situations. A few designers have been caught out with this.
You are using an outdated browser version not supported by this website.
Click here to upgrade your browser
5,310 products with technical literature, drawings and more from leading suppliers of NZ architectural materials.
Case studies, new products and product news from leading suppliers of NZ architectural materials.
Blogs for architectural specifiers, offering product, design and business advice.
With the building code calling for higher R-values, one of the issues faced by designers is the space required for insulation, particularly in skillion roof situations. A few designers have been caught out with this.
Various members of the construction industry discuss questions from the recent eboss survey.
Various members of the construction industry discuss questions from the recent eboss survey.
Various members of the construction industry discuss questions from the recent eboss survey.
Achieving a weathertight building envelope is a matter of managing water. During a dwelling’s lifespan, it is inevitable that some moisture content or penetration will enter through the envelope.
In the past the junction between Linea Weatherboard and CLD Fascia has been constructed using a scriber to cover the sealant joint.
Various members of the construction industry discuss questions from the recent eboss survey.
There is a growing trend to fix Titan Facade Panels over tilt slab in certain applications.
Oil-based paints are particularly poor outdoors with rapid gloss drop-off, chalking, and embrittlement happening over time.
I previously mentioned that the vast majority of paint sales are now water-based.
New and updated architectural products, design solutions, inspiration, technical advice and more when you sign up for EBOSS.