With the building code calling for higher R-values, one of the issues faced by designers is the space required for insulation, particularly in skillion roof situations. A few designers have been caught out with this.
You are using an outdated browser version not supported by this website.
Click here to upgrade your browser
5,309 products with technical literature, drawings and more from leading suppliers of NZ architectural materials.
Case studies, new products and product news from leading suppliers of NZ architectural materials.
Blogs for architectural specifiers, offering product, design and business advice.
With the building code calling for higher R-values, one of the issues faced by designers is the space required for insulation, particularly in skillion roof situations. A few designers have been caught out with this.
Transparent and semi-transparent coatings on timbers do not have the same life cycle as opaque coatings.
Outside Canterbury, the general tenor of economic information during the past month has been encouraging.
Statistics NZ have released information on the number of building consents issued in March 2011.
This post covers off some of the causes of visible stopping lines after painting.
The February Canterbury earthquake, combined with the fact the NZ economy was already struggling, pushed the Reserve Bank to cut the official cash rate by 50 basis points at its March meeting.
I received this note yesterday from a small supplier situated in Christchurch:
The New Zealand labour market closed out 2010 on a low note, with employment declining and the unemployment rate rising to 6.8%.
The New Zealand economy struggled over the second half of 2010.
When it comes to using water based paints some might disregard the fact that as paint dries the water is evaporating from the painted surface.
New and updated architectural products, design solutions, inspiration, technical advice and more when you sign up for EBOSS.